Bono Consulting prepared the site plans for this new condominium complex in the South loop Chicagoland area. The design proved challenging as there was no space outside the building for a stormwater detention facility. Since there is no basement on this building, we designed the stormwater detention to store in large diameter pipes under the first-floor slab.
The engineering design also included sanitary and water services, grading around the building, and a new public sidewalk. Many improvements were necessary to bring the public way into compliance with current ADA requirements. The project has since been completed and is open for residency.
Chicago Civil Engineering | Storm Water Management Engineering Chicago