Water Main Design, Glenview

Bono Consulting was retained by the Village of Glenview to provide detailed engineering, topographic survey and construction assistance for this water main reconstruction on Tanglewood Drive. It was a rush project and the total elapsed time from design initiation to water main construction was four weeks.

Permits were required from IEPA.

Project status: Project was completed in 2006.